We were asked to reinstate some excavations after Historic Scotland carried out some archaeology works within Cameron Toll car park.
The team cleared all site dig out, saw cut and squared off all excavations, installed 100mm 20mm binder, installed a step joint via cold milling, then finished off with machine laying 10mm Enhanced carpave & overbanding all joints. Our lining crew attended the site to reinstate all road markings within the working area, with a final road sweep to complete the works.
Our surfacing operatives even decided to strip the working area, stacking the traffic management neatly for the supplier to uplift.